Programme: Major restructuring, creation of 126 housings with 10 rooms for disabled workers, 1 caretaker’s apartment, two shops on the street, communal rooms on the ground floor Location: Rue Saint-Lazare, Paris (75009) Client: Paris Habitat Price: 4,8 M€ HT Surface area: 2950 m² Calendar: Delivery 2009 Other participants : Artists : Frédéric Delangle, Valérie Sanfratello, Christoph Sillem et Laure Vasconi
Hybride orné
The rehabilitation work consisted of gutting the Haussmann building, (...)
Home > Keywords > Status > Completed
Completed
Articles
-
’young workers’ residences, paris 9th
2009 -
MULTIPURPOSE SCHOOL, STUDENT HOUSINGS AND CENTRAL KITCHEN, PARIS 17
7 November 2015Programme: Dormitory housing 152 students + 1 caretaker housing, school canteen, central production kitchen 1250 meals / day, comprehensive school of 12 classes and leisure center + 2 caretaker housings Location: ZAC Cardinet Chalabre, Paris (75017) Client: RIVP Price: 21,47 M€ ex-Tax Surface area: 10 065 m² Calendar: Completed in 2015 Performance: BBC Effinergie project - NF HQE Commercial Buildings - H & E profile performance option
Transitions
Sustainable city is the challenge of (...) -
360 UNITS HOUSING IN PONTOISE (95)
2015Programme : 360 housing units Location : ZAC Bossut, Pontoise (95) Client : I3F + Val d’Oise Habitat Price : 43,75 M€ HT Surface : 11400 m² Calendar : Delivery 2015 Performance : RT2012 - H&E Others : Léon Grosse general contractor / PLAN01 main architect associated architects :KOZ+ IPA+JBA+ADP+PHILEAS
Fairness for housing
The major question posed by the tender for the 360 homes on the Pontoise ZAC BOSSUT is: How to ensure both quality and diversity for such a large property in such a (...) -
renewal of the metro
2011Programme: Renovation without interruption to the traffic of 31 metro and 7 RER stations, adaptation for accessibility for people with special needs Location: Paris Metro and RER (Express Lines) Client: RATP Price: 40 M€ ex-Tax (metro) - 13.5 M€ ex-Tax (RER) Calendrier: Execution 2002 - 2011
LOCATION
4 large interconnections Nation, Strasbourg Saint-Denis, République, Trocadéro
27 stations Line 1: Saint Paul Line 2: Père Lachaise, Pigalle Line 3: Porte de Champerret, Wagram, Malesherbes (...) -
131 UNITS OF MIGRANT WORKERS HOUSING, PARIS 20
1 December 2017Location: 23, Rue du Retrait, Paris (75020) Client: Antin Résidences / Coallia Cost: 8,340 M€ ex-Tax including demolition works Area: 3030 m² Schedule: Competition 2012 - Delivery 2017 Performance: Projet BBC - H&E profil A - Plan climat Artist (mural painting) : Jérôme Mesnager
COUTURE PARIS TOPOLOGY
This socially-focused project demonstrates the ability of a typical parisian plot to be developed and transformed, even in a very restricted site. How can we guarantee the successful complex (...) -
french diplomatic campus in mali
2005Programme : French consulate en embassy / treasury / SCTIP (Police International Technical Cooperation Services) / SCAC (Cooperation and Cultural Action Service) Location : Bamako, Mali Client : Ministry of Foreign Affairs - Ministry of the Interior Price : 4.12 M€ ex-Tax Surface area : Embassy: 1800m2, Consulate: 1120m2, SCTIP: 230m2 Calendar : Delivery in several phases : 2002, 2003, 2005
DELIVERY IN SEVERAL PHASES 2002/2003/2005
This operation took place on an occupied site, in three (...) -
IUT FOR BIOCHEMISTRY, BOULOGNE-SUR-MER (62)
2013Programme: Haliomarine Biochemistry (halls/classrooms, rooms for practical work and preparation / administration / technical rooms / laboratory and research / lecture theatre) Location: Port of Boulogne-sur-Mer (62) Client: Université du Littoral Price: 4,1 M€ ex-Tax Surface area: 4000 m² Calendar: Competition 1996 - Delivery 1998
REDEVELOPMENT OF A PORT SITE
The project reveals the desire to create a built facade to support academic activities and mark the boundary between the town and the (...) -
LYCEE JOLIOT CURIE, DAMMARIE-LES-LYS (77)
2007Programme : Rénovation et extension des ateliers du lycée, désamiantage, restructuration lourde, extension des ateliers de microtechnique, de maintenance et d’électrotechnique, en cinq phases, en site occupé avec bâtiments provisoires Lieu : Dammarie-les-Lys (77) Client : Région Ile-de-France Prix : 4,52 M€ HT Surface : Restructuration : 3100 m² - neuf : 1030m² Calendrier : Livraison 2007
Peau arborée
Le lycée Joliot-Curie est composé de bâtiments des années 70, éparpillés dans un site caractérisé (...) -
Nursery des Bordeaux, Charenton-le-Pont (94)
2004Programme: Nursery, 60 cradles Location: Charenton-le-Pont (94) Client: Ville de Charenton-le-Pont Price: 2,8 M€ ex-Tax Surface area: 1300 m² Calendar: Competition 2002 - Delivery 2004 Other participants: Photographer serigraphy : Laure Vasconi
sheltered enclosure
In Charenton, crib Bordeaux is implanted on a narrow plot sandwiched between a railway trench and an urban complex consisting of multiple units of average height.
In the South, built buildings housing mass crushes the site. To (...) -
multipurpose school GUILLAUME APPOLINAIRE, BONDY (93)
2007Programme: Primary school Location: Bondy (93) Client: Ville de Bondy Price: 5,7 M€ ex-Tax Surface: 3100 m² Calendar: Competition 2005 - Delivery 2007 Performance: Projet certifié HQE NF Bâtiments tertiaires
Open institution
We had to build a school of the XXI century, as part of a sustainable development in a sensitive suburbs, and in a particularly heterogeneous and unstructured area, though the city center.
These issues led us to reflect on the symbolic function of school today, which (...)